Discovery
Inventory applications, infrastructure, data, integrations, traffic and owners.
We inventory dependencies, risks and change windows before execution. Then we migrate in stages, validate, document and leave a rollback strategy proportionate to the environment.
THE PROBLEM
Moving servers or containers is only one part. Data, DNS, certificates, networks, integrations, change windows and teams all need to be considered before anything moves.
WHEN TEAMS CALL US
We need to move on-premise infrastructure to cloud.
We want to change provider without repeating current problems.
An application needs to move to AKS, EKS or GKE.
The current cluster is old or hard to maintain.
A legacy platform is blocking product changes.
We need to reduce disruption and have a clear way back.
WHAT WE DO
We do not assume everything should move the same way. We classify workloads, dependencies and risk to choose the right sequence.
Inventory applications, infrastructure, data, integrations, traffic and owners.
Identify communication paths and the order that constrains migration.
Define the AWS, Azure, GCP or Kubernetes destination and operating changes.
Group workloads, windows, owners, success criteria and decision points.
Validate connectivity, deployment, performance, data, backups and operations.
Automate and coordinate migration with traceable steps.
Check service, data, observability and dependencies after each phase.
Document when and how to return if validation criteria are not met.
An application, service or process that needs to run on the platform.
The moment traffic or operations switch to the new environment.
The plan for returning to the previous environment if validation fails.
DISRUPTION AND EXPECTATIONS
Where architecture allows it, we can design strategies to minimise or avoid disruption. This must be assessed case by case.
On-premise, current cloud provider, virtual machines or existing Kubernetes.
AWS, Azure, GCP, EKS, AKS, GKE or another agreed platform.
Terraform, OpenTofu, Docker, Helm and GitOps.
Observability, backups, recovery, access and post-migration procedures.
Every phase has entry criteria, validation and a clear decision on how to proceed.
HOW WE WORK
Build the inventory and dependency map.
Agree destination, phases, risks and acceptance criteria.
Create infrastructure, automation, observability and tests.
Execute in phases and record each change.
Validate, document and transfer operations to the team.
WHAT THE CLIENT RECEIVES
Delivery does not end when the last data is copied.
WHEN IT MAKES SENSE
OUTCOME
CLOUD & KUBERNETES MIGRATION
We can turn the current environment into an inventory, identify dependencies and design a controlled first phase.